Stairs Installed To Mezzanine!
View From Mezzanine
Brick Work Finished To Ceiling Of Office Area
Almost Done With Bricks To Ceiling Of Sand Room
Two More Overhead Doors Installed..Only Sand Room Door Left
A site where you can keep up to date on everything going on at the Waukegan National Airport.
Saturday, January 29, 2011
Thursday, January 20, 2011
SRE Update: January 20
Overhead Door Installed, Along With A Gray Walk Through Door East Side
Another Gray Walk Through Door Installed West Side
Same Door Different View. Note: Outside Lights Installed Also
Another Gray Walk Through Door Installed West Side
Same Door Different View. Note: Outside Lights Installed Also
January 19 Plane Incident
The Plane Was Actually Traveling In The Direction The Camara Was Looking
And Ended Up 180 Degrees The Other Way
This Is Everyone Getting Set Up For The Removal
Just Before The Final Pull
And Just After
Being Towed Off Of Runway
Spot Where Plane Had Rested
And Ended Up 180 Degrees The Other Way
Just Before The Final Pull
And Just After
Being Towed Off Of Runway
Spot Where Plane Had Rested
VIDEO: January 19 Removal Of Plane That Slid Off Runway
Not Much, But Slow Video Of Whitmore's Pulling Plane On Runway
Saturday, January 15, 2011
More Video! January 14 Pour Of The Floor!
Northeast Section Pumped With Concrete
360 Degree View Of Floor
360 Degree View Of Floor
VIDEO: January 13 Pour Of The Floor! It's True!
Video Evidence Of The Floor Pour Starting..See It! Believe It!
More of the Pour (A Quick One)
Some Finishing Work On Ramps
More of the Pour (A Quick One)
Some Finishing Work On Ramps
SRE Update: January 14 Floor Pour
A Look At The Two Completed Sections From Yesterday
Concrete Being Pumped Into Northeast Section
Finished East Section
Almost Finished Southwest Section
Sawed Southeast Section
A View Of Keith, And The Northwest Finished Section
Concrete Being Pumped Into Northeast Section
Finished East Section
Almost Finished Southwest Section
Sawed Southeast Section
A View Of Keith, And The Northwest Finished Section
SRE Update: January 13 Floor Pour
OMG! The Floor Is Being Poured!!!
Starting The Ramps Above, And The Southeast Corner Below
Southeast Corner Finished, Northwest Just About
Starting The Ramps Above, And The Southeast Corner Below
Southeast Corner Finished, Northwest Just About
Wednesday, January 12, 2011
VIDEO: January 11 Snow Storm
Plowing The West Edge Of Runway 5/23
Storm Getting Heavier
Snow 3 (Jeff) Passing By
Again The Snow Is Heavy
Some Night Time Action
The Next Day..Dry Runway!
Sunshine and Snow Blower Action
Storm Getting Heavier
Snow 3 (Jeff) Passing By
Again The Snow Is Heavy
Some Night Time Action
The Next Day..Dry Runway!
Sunshine and Snow Blower Action
Monday, January 10, 2011
January 10, 2011 SRE Update
Electrical Boxes Mounted On Walls
Conduit Trenched In Gravel Shop Floor
More Boxes Mounted On The Brick Walls
All Plumbing Problems Repaired For Floor Pour
Conduit Trenched In Gravel Shop Floor
More Boxes Mounted On The Brick Walls
Subscribe to:
Posts (Atom)