This Summer We Purchased Two New/Used Brooms From Des Moines Iowa.
They Are Both Oshkosh Series H Chassis, With 20 Foot MB Brooms. This One Is A 2001.
This Oshkosh Is A 2002. We've Upgraded From Our Previous 1988 Idaho Norlands.
They Will Probably See Some Action This Saturday, November 21, 2015!
A site where you can keep up to date on everything going on at the Waukegan National Airport.
Thursday, November 19, 2015
Friday, September 18, 2015
Tuesday, August 18, 2015
Perimeter Fence project Phase 3 Update
Pedestrian Gate By The AOO
South Ramp Gate 1
Gate Installed At The Landfill Entrance On Hickory Street
From Hickory Street Gate Towards Oak Street
Looking Back Towards Oak And Hickory Streets
Looking East Towards Lewis Avenue
Connecting Finally To Phase 1 Fence Project At Lewis Avenue
South Ramp Gate 1
Gate Installed At The Landfill Entrance On Hickory Street
From Hickory Street Gate Towards Oak Street
Looking Back Towards Oak And Hickory Streets
Looking East Towards Lewis Avenue
Connecting Finally To Phase 1 Fence Project At Lewis Avenue
Wednesday, July 29, 2015
Perimeter Fence Project Phase 3 Update
SRE/Plane Rest Drive Gate installed. Not Electrically Operational Yet
Airport Ops Office Gate Goes Here, But Fence Is Installed
South & North Parking Lot Fence Installed, As Well As The South Ramp Gates
Landmark's Ramp Gates Installed
Grainger Gate Installed
Fence From Grainger To Fuel Farm Installed
Airport Ops Office Gate Goes Here, But Fence Is Installed
South & North Parking Lot Fence Installed, As Well As The South Ramp Gates
Landmark's Ramp Gates Installed
Grainger Gate Installed
Fence From Grainger To Fuel Farm Installed
Tuesday, July 7, 2015
July 7, 2015 Phase 3 Fence Update
The Moved Gate 4 Installation Begins
Fence Post Installed Between The Two Hangars On McAree Road
South Ramp Fence Post Installed By Self Serve Fuel Station
Fence Post Installed Between The Two Hangars On McAree Road
South Ramp Fence Post Installed By Self Serve Fuel Station
Thursday, June 25, 2015
Perimeter Fence Project Phase 3 Update
Looking From Hickory Street Towards Oak Street
Looking Back At Stump Grinder Near Hickory Street
Loading Trailer Parked On Oak Street With Brush From Old Fence Line
Wood Chipper & Trailer Parked On Oak Street
Looking Away From Oak Street Towards Lewis Avenue
Looking Back Towards Oak Street Houses
These Next Three Pictures Are The Final Leg Connecting Fence To Lewis Avenue
Looking Back At Stump Grinder Near Hickory Street
Loading Trailer Parked On Oak Street With Brush From Old Fence Line
Wood Chipper & Trailer Parked On Oak Street
Looking Away From Oak Street Towards Lewis Avenue
Looking Back Towards Oak Street Houses
These Next Three Pictures Are The Final Leg Connecting Fence To Lewis Avenue
Subscribe to:
Posts (Atom)