Monday, September 13, 2010

Waukegan Regional Airshow

Sept. 11...A Wet Start In The A.M.
                                 
Doesn't Look To Good For Flying

No Lines Here With The Rain

Wet And Miserable

                                                      
  Grant's Yak Feeling The Rain
     
But..Things Are Starting To Look Good!
                              
Drying Out Now

Color Guard Starts The Show

The Crowd Gathers, The Concete Dries Out

The Jet Powered Outhouse

The Hopper Flight Team

The Aerostars...I Think


Extra 300 Stunt Plane
     
Paul's Sabre

Greg Keeping The Airshow Running Smoothly                                                                                                                                              

North Parking Lot Getting Full


South Lot About The Same

And They Keep Coming

The Crowd Enjoying The Show



Lines Are A Little Different Than Earlier

Jet Powered Bus

 Trojan Horsemen
         
         
 Wing Walker
  
   

P-51 Mustang
                                                                                                  
                             

The A-10 Warthog!

                 
                 
Mustang & Warthog
                                     
   That Brings Out The F-18 Baby!
                                        
                 
                      

Buckeye & F-18
                                    

Thursday, September 9, 2010

SRE Building...Not Much Changed, Hoping For The Best

Sept. 9...Core taken to check for proper strength
                
Sept. 9...West exit door ready for concrete
                 
Sept 9...Oil water seperators
         

Runway 14-32

Sept. 9...Looking towards Runway 14
                                 
Sept. 9...Sod and grass seed sprayed in place
                                                              
                           
                                   
End of Runway 14
                                               
Sept. 9...Finishing up at the end of Runway 32
                                                           

Saturday, September 4, 2010

SRE Building - Hopefully The Walls Will Stand!

Sept. 3...Sand/Vault Room stone installed and compacted

Sept. 3...Electrical ducts installed.
       
Sept. 3...Office and breakroom with compacted gravel.
    
Sept. 3... Water hooked up!   

Sept. 3...Center drain all ready for the floor.

Sept. 3...Electric stubbed in.