Wednesday, July 29, 2015

Wings Of Freedom Tour! WWII Flying History Landed Today!

 The P 51. All Three Will Be Here Until The End Of July

 The B 24

 The B 17




Perimeter Fence Project Phase 3 Update

SRE/Plane Rest Drive Gate installed. Not Electrically Operational Yet

 Airport Ops Office Gate Goes Here, But Fence Is Installed

South & North Parking Lot Fence Installed, As Well As The South Ramp Gates





Landmark's Ramp Gates Installed



 Grainger Gate Installed

Fence From Grainger To Fuel Farm Installed

Tuesday, July 7, 2015

July 7, 2015 Phase 3 Fence Update

 The Moved Gate 4 Installation Begins

 Fence Post Installed Between The Two Hangars On McAree Road

South Ramp Fence Post Installed By Self Serve Fuel Station

Thursday, June 25, 2015

Perimeter Fence Project Phase 3 Update

 Looking From Hickory Street Towards Oak Street



Looking Back At Stump Grinder Near Hickory Street

Loading Trailer Parked On Oak Street With Brush From Old Fence Line

Wood Chipper & Trailer Parked On Oak Street

Looking Away From Oak Street Towards Lewis Avenue


Looking Back Towards Oak Street Houses

 These Next Three Pictures Are The Final Leg Connecting Fence To Lewis Avenue




Wednesday, June 17, 2015

Update of the Phase 3 Perimeter Fence Project

 These are trenches for the Plane Rest Drive Gate. Power will come from our vault.

The gate is being moved in farther for easy public access to the airport office's.



 More pipe trenched in from the vault to Plane Rest Drive.

Pipe not yet trenched in from the vault to the new electric pedestrian gate.

 Old fence at the Operations Office removed, with some temporary poles installed

These next two pictures are from the start of install on McAree Road looking west.


Wednesday, June 10, 2015

Perimeter Fence Project Phase 3

 Started the last week of May, the Perimeter Fence Project Phase 3 began.






 These are from Yesterday, June 9th looking towards McAree Road.





These are from June 10, 2015. Fence going up from start of entrance road.



New 20 foot manual gate here on entrance road.






Wednesday, January 28, 2015

Perimeter Fence Project Phase 2 Update January 28, 2015

 End Of Aviation Drive

 All Barbed Wire Installed

 Looking Towards Wadsworth Road From Aviation Drive



 Obstruction Lighting In Place Along Wadsworth Road, Approach End Of Runway 14



 Construction/Maintenance Gate Installed At Wadsworth Road

 Black Vinyl Meets Standard Fence At Baxter

Black Vinyl Gate Installed At Baxter As Well

 End Of Black Vinyl Fence Looking Towards Lewis Avenue On Wadsworth By Baxter

 Looking Towards Approach End Of Runway 23 On Wadsworth

 On Wadsworth looking Towards Lewis Avenue

Corner Post Where Phase 1 and Phase 2 Fence Meet At Wadsworth And Lewis Avenue