SRE Building - Storm Drains Installed/ Inside Building Drains Installed

August 27...Area for "The" Sink


August 27...Oil Separator's Installed

August 27...Middle of SRE With Center Drain
August 27 ... Overview

August 27 ... Car Parking Lot
August 27...East Entrance With Door Drain Installed                                                  
 August 27..."Vault" and Drain For Wash Bay
August 27...South Side Concrete Drive Portion      
August 27...Entrance To Southside Concrete Drive                                             
                                                                                                                                                                                                        