Taxiway C Was Milled Yesterday & Being Repaired Today
All Of The Bad Cracks Were Milled Down And Repaired With Asphalt
This Is C2 Crossover Taxiway Which Will Be Much Wider Than Before
Same As Above, But Reverse View Looking Northeast
This Is What The Repairs Look Like After Milling. Edges Drains Also Being Installed
No comments:
Post a Comment