Taxiway C Update October 4, 2013
Taxiway C Is Now Open From C3 To Runway 5/23
Baxter's Ramp Is Temporarly Paved For Use
Taxiway C2 Is Now Wider Also. Finished Paving Should Be Done By Months End
Work In Stage 2B & 2C Will Continue. Runway 14/32 Will Be Closed Starting Monday
Thursday, September 12, 2013
Wednesday, September 4, 2013
Taxiway C Update September 4, 2013
Taxiway C Was Milled Yesterday & Being Repaired Today
All Of The Bad Cracks Were Milled Down And Repaired With Asphalt
This Is C2 Crossover Taxiway Which Will Be Much Wider Than Before
Same As Above, But Reverse View Looking Northeast
This Is What The Repairs Look Like After Milling. Edges Drains Also Being Installed
All Of The Bad Cracks Were Milled Down And Repaired With Asphalt
This Is C2 Crossover Taxiway Which Will Be Much Wider Than Before
Same As Above, But Reverse View Looking Northeast
This Is What The Repairs Look Like After Milling. Edges Drains Also Being Installed
Friday, August 30, 2013
Taxiway Charlie Construction Update
Taxiway C Is Getting Wider. From Forty Feet To Fifty
Starting On The Edges First
A Portion Of Baxter's Ramp Has To Be Adjusted Also
Starting On The Edges First
A Portion Of Baxter's Ramp Has To Be Adjusted Also
Thursday, March 14, 2013
New Website For Our Airport
We Now Have A New Website To Replace Our Old Outdated One. Check it Out!
http://waukeganport.com/wkgn_airport/
http://waukeganport.com/wkgn_airport/
Subscribe to:
Posts (Atom)